Seamless mirror wallpaper pattern — Medicine by wallpaper⁶

Pharmacology · Mirror — Custom AI Medicine Wallpaper — Peel & Stick — wallpaper⁶

50cm x 300cm
$66.00
Sale price  $66.00 Regular price 
Skip to product information
Seamless mirror wallpaper pattern — Medicine by wallpaper⁶

Pharmacology · Mirror — Custom AI Medicine Wallpaper — Peel & Stick — wallpaper⁶

$66.00
Sale price  $66.00 Regular price 
Roll size

Pharmacology · Mirror — wallpaper⁶

A made-to-order self-adhesive wallpaper roll built from a seamless mirror repeat. The design turns pharmacology into a crisp Medicine surface for studios, bedrooms, offices and statement walls.

Generated with the wallpaper⁶ Medicine skill: a source image is cropped square, transformed through Mirror symmetry, filtered for repeat clarity, then exported as a print-ready seamless tile.

About this pattern
  • Category: Medicine
  • Mode: mirror4
  • Tags: medycyna, mirror4, pattern, wallpaper, seamless
  • Inspiration: Pharmacology
  • Created by wallpaper⁶ AI atelier

File:Progress report of the Western Utilization Research and Development Division (IA SER73922358004).pdf

About offRAL™ material

🔥 offRAL Highlights

  • Plastic-Free. Nontoxic. Bio-degradable.
  • No damage, No dirt, No odor.
  • No brushes, No foil, No buckets, No paint rollers, No paint cans, No unnecessary packaging, No painters, No waste, No risk.
  • Perfect for every smooth surface.
  • Custom Made in Switzerland 🇨🇭, Poland 🇵🇱, US 🇺🇸.
  • 3-years Guarantee.

Meet offRAL™ - the pain(t) killer

Peel & Stick, Removable, Re-usable and Bio-degradable Paint 2.0 - offRAL™. With a production process that uses 87% less water and emits 93% less CO2 than standard liquid paint it is a totally eco-friendly alternative for printing patterns on walls and furniture.

Paint Reinvented

Experience a new era of wall art with offRAL™'s innovative, breathable material that neither rips nor wrinkles. Each roll can be repeatedly used and easily stored on its original backing paper. Designed for effortless installation by a single person, offRAL™ is odorless, ozone-free, and completely biodegradable. Free from PVC, Glycol-Ether, Formaldehyde, Phthalates, reactive monomer chemistry, and Hazardous Air Pollutants (HAPs).

Advanced Green Manufacturing

Production uses 87% less water and emits 93% less CO2 compared to traditional liquid paint manufacturing.

Roll Sizes

  • 50 cm × 300 cm (~19.7" × 118.1"), ~0.32 kg (0.71 lbs)
  • 50 cm × 600 cm (~19.7" × 236.2"), ~0.63 kg (1.39 lbs)
  • 50 cm × 1200 cm (~19.7" × 472.4"), ~1.26 kg (2.78 lbs)

Dyeing Method

HP Latex Optimiser separates and immobilises pigments at the print substrate surface — sharp color detail, matte finish with vibrant colors.

Application

Every smooth surface: walls, doors, tables, desks, wardrobes, fridges, cupboards, windows, electronic devices. Easy to keep clean with a dry cloth.

Surface Preparation

Surface must be clean, dry, degreased, free from dust and loose elements.

Tools Needed

Hands, heart, and tailor's scissors. A hard roller helps. ~6–9 min per roll, solo install.

Label

RALRAW® AG, owner of the offRAL™ trademark. 3-year guarantee. CE. ISO 9001. Designed in Switzerland. Custom Made in Switzerland, Poland, USA.

Sizes, weight & shipping
Size Coverage Weight Price (CHF)
50 × 300 cm 1.50 m² 320 g 66.00 CHF
50 × 600 cm 3.00 m² 630 g 115.00 CHF
50 × 1200 cm 6.00 m² 1260 g 215.00 CHF

Ships from Switzerland 🇨🇭, Poland 🇵🇱, US 🇺🇸. 3-year guarantee.

Care & warranty

Plastic-free, biodegradable, removable. Wipe with a dry cloth. 3-year guarantee. Free from PVC, formaldehyde, phthalates and HAPs.

You may also like